Friday, September 25, 2009
51 hours into the project... Sep 25, 2009
One more sanding was done this week on the outside bottom of the boat. Today, September 25, Dennis Higginbotham joined Loy and me to sheath the bottom of the boat. Took us a little over 2 hours. We laid out cloth over the bottom of the baot and painted it liberally with epoxy. Tomorrow we will paint on another layer of epoxy, takes about 1/2 hour. No pictures of today's work, the boat basically looks the same.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment