Saturday, May 8, 2010
149 Hours, 44 Days, Coning, May 8, 2010
Today we cut out and installed the coning on the decking. We had to rip three inch wide strips of plywood. The pieces for the front curved area had to be soaked in boiling water so that we could bend them without breaking. We used copper nails and then mixed epoxy and mahogany saw dust to seal spaces.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment